Surge impedance and SIL were recalculated while a non-convergent PowerWorld archive and policy figures were kept in separate evidence classes.
765 kV inputs and run status
Surge impedance and SIL were recalculated while a non-convergent PowerWorld archive and policy figures were kept in separate evidence classes.
- Status
- Zc 255.38 Ω · SIL 2.292 GW · PWB rerun: Blackout
- Evidence
- Source-Derived · Independent Recalculation · PowerWorld 24 Tool Rerun
- Contribution
- Team Project · Individual contribution unconfirmed
Line calculations versus power-flow output
The core engineering task is evidence separation: reproducible line arithmetic, a solver-divergence archive, and policy figures must not be collapsed into one result. The line values were independently recalculated; divergence is retained only as debugging evidence.
- Lossless Zc and SIL use 765 kV, 350 km, z=j0.3 Ω/km, and y=j4.6 µS/km.
- Independent results are Zc≈255.38 Ω, SIL≈2.292 GW, and current≈1.729 kA.
- Non-physical per-unit voltages and blackout state are not interpreted as real-grid performance.
- PowerWorld 24 reran the saved 2214 MW `newcase.pwb` state and reproduced Blackout.
- 2038 demand, peak, and capacity figures retain their report/source context.
Zc, SIL, and demand values
PowerWorld model views
Source result views excluding student identifiers, personal data, local paths, and third-party teaching material.
Transmission-line recalculation
Calculated values and solver state
Blackout diagnosis versus report values
The PowerWorld 24 rerun confirms a Blackout diagnostic for the saved 2214 MW state; it does not validate the report's 3000/3100/3200 MW stages or 5380 MW compensated case. Dynamic stability, protection, N-1, and production-grid validation are not claimed. Personal identifiers in the GUI are withheld.